Guide · for valve and flow control makers · updated
From RFQ to quotation: how can a valve maker quote faster and follow up every one?
Most of the time between a valve RFQ arriving and the quotation leaving is spent on routine work: reading line items and datasheets, matching each line to a product, finding the open questions and chasing them. A valve maker quotes faster by deciding early what it will quote, putting every line into one structured list, drafting the price from its own price list for an engineer to check, and handing each enquiry to one owner, at the factory or a distributor, who follows it up until the buyer answers.
What arrives in a valve RFQ?
Often more than one valve. An RFQ from a plant, an EPC contractor or a distributor is often a list of line items, each with a tag or item number, a quantity and a description, and often a datasheet per tag. For instrumentation, a buyer may use specification forms such as those ISA publishes: ISA says its ISA-20 forms promote uniformity in instrument specification, in content and form, and facilitate quoting, purchasing, receiving, accounting and ordering. Evidence · reported ISA software: ISA-TR20 and ISA-20 specification forms. International Society of Automation. Listed with the other sources at the end of this page. International Society of Automation · checked 5 Nov 2026 Open the evidence →
Around the line items sit the conditions that decide whether a line can be quoted at all, and at what cost.
| Part of the RFQ | What it decides | Where it usually goes wrong |
|---|---|---|
| Line items and quantities | What you are pricing | Lines that mix several valves, or quantities that differ from the datasheet |
| Datasheets per tag | Type, size, class, materials, ends, operation, service conditions | Missing fields, or a datasheet that contradicts the line description |
| Standards and specifications named | Design, testing and marking rules; for example API 598 or ISO 5208 for testing Evidence · reported API STD 598:2023 Valve Inspection and Testing. BSI Knowledge, 1 Feb 2023. Listed with the other sources at the end of this page. BSI Knowledge · checked 5 Nov 2026 Open the evidence → Evidence · reported BS ISO 5208:2015 Industrial valves. Pressure testing of metallic valves. BSI Knowledge, 31 Jul 2015. Listed with the other sources at the end of this page. BSI Knowledge · checked 5 Nov 2026 Open the evidence → | An edition older or newer than the one you build to |
| Inspection documents | Which certificates go with the valves; EN 10204 defines types of inspection document for metallic products Evidence · reported BS EN 10204:2004 Metallic products. Types of inspection documents. BSI Knowledge, 25 Oct 2004. Listed with the other sources at the end of this page. BSI Knowledge · checked 5 Nov 2026 Open the evidence → | A certificate type asked for that your foundry or forge doesn't supply |
| Delivery terms | Who carries cost and risk to where; the Incoterms rules are eleven three-letter terms for this Evidence · reported Incoterms rules. International Chamber of Commerce. Listed with the other sources at the end of this page. International Chamber of Commerce · checked 5 Nov 2026 Open the evidence → | A delivery term that changes the price but is read after it has been set |
| Deadline and format | When and how the quotation must arrive | A portal or form that has to be used, found the day before the deadline |
Every one of these has to be read before a price means anything. That reading is where the time goes.
Why does a valve quotation take so long?
Because most of the work needs an engineer, and most of an engineer's time on an RFQ is spent on work that isn't engineering. Copying line items from a PDF into a spreadsheet, looking up whether a size and class combination exists in the catalogue, finding the trim material that matches the service, and writing the same clarification questions as last month are all routine. The judgement, whether a valve suits the service and what to offer when it doesn't, is a small part of the total, and it waits behind the rest.
Control valves add a step. A control valve usually has to be sized for its service before it can be priced, and IEC's sizing equations are in IEC 60534-2-1, which covers the flow of compressible and incompressible fluids through control valves and says its incompressible-flow equations aren't intended for non-Newtonian fluids, mixtures, slurries or liquid-solid conveyance. Evidence · reported IEC 60534-2-1:2011 Industrial-process control valves, Part 2-1: Flow capacity, sizing equations for fluid flow under installed conditions. IEC Webstore. Listed with the other sources at the end of this page. IEC Webstore · checked 5 Nov 2026 Open the evidence → An RFQ for a slurry service, in other words, is a conversation with the buyer before it is a calculation.
Then there are the delays nobody owns: the RFQ that arrived in a salesperson's inbox while they were travelling, the one sent to the factory for a market a distributor covers, and the clarification answered by the buyer but read by nobody.
Should you quote every RFQ?
No, but you should answer every one. At least one large owner measures it. Aramco's material supplier guide of January 2020 asks suppliers to acknowledge in its supplier portal whether they intend to quote, and to give a reason when they won't. Evidence · reported Material Supplier Guide. Saudi Aramco, Jan 2020. Listed with the other sources at the end of this page. Saudi Aramco · checked 5 Nov 2026 Open the evidence → Among its supplier performance measures, bidding participation, the share of RFQ line items a supplier has either quoted or declined out of all those sent, carries 10% of the weight, and on-time delivery 60%. Evidence · reported Material Supplier Guide. Saudi Aramco, Jan 2020. Listed with the other sources at the end of this page. Saudi Aramco · checked 5 Nov 2026 Open the evidence → On that measure, a supplier that leaves RFQs unanswered scores lower.
A quick decision on every RFQ, made the day it arrives, saves more time than any tool. In the order we would ask:
- Is it ours? Check the valve types, sizes, classes and standards against what you make. If it belongs to a distributor's market or another company in your group, pass it on now, with the file.
- Can we meet the specification? Note every line that needs a deviation, and every standard edition or certificate type you can't supply.
- Can we meet the deadline and the delivery? A quote you can't deliver on time does more harm than a polite no.
- Is it worth it? A one-off line for a valve you rarely make may be worth quoting for a buyer you want, and not for one you don't.
- Decide and tell the buyer: quote, quote in part with deviations, or decline with a reason. Record the decision against the RFQ.
Declining with a reason is an answer. Silence is the one response that loses both the order and the buyer's next RFQ.
How do line items and datasheets become a quotation?
Through one structured list. Whatever form the RFQ arrives in, a PDF, a spreadsheet, a portal export or an email, the first job is to turn it into one row per line with the same fields every time: the buyer's tag, quantity, valve type, size, class, body and trim materials, ends, operation, standards, testing, certificates and anything else your price depends on.
Once it is a list, each line can be matched to a product code in your catalogue, or flagged when it can't be. The flagged lines are the engineer's work; the matched lines are pricing. A deviation column, filled as the lines are checked, becomes the technical clarification the buyer receives with the quotation, and a question column becomes the clarification you send before it.
The list is also what lets two people work on one RFQ without emailing spreadsheets back and forth, and what lets a distributor or a sister company see exactly what was quoted. If the buyer's datasheets follow a standard form, the fields map the same way every time, which is the point of forms like ISA's. Evidence · reported ISA software: ISA-TR20 and ISA-20 specification forms. International Society of Automation. Listed with the other sources at the end of this page. International Society of Automation · checked 5 Nov 2026 Open the evidence →
This is the part a custom quotation tool is built for: reading the RFQ into the list, matching what it can, and leaving the rest, clearly marked, for a person.
What should a quotation tool do, and what should it not?
It should do the reading and the arithmetic, and leave the decisions to people.
- Read RFQs from email, forms and portals into one line-item list, keeping the buyer's own tags and wording.
- Match lines to your product codes and flag what it can't match, with the reason: size not made, material not offered, standard edition different.
- Price matched lines from your own price list, with the discounts and levels you set for each buyer and distributor.
- Draft the quotation, the deviation list and the clarification questions in your format, for an engineer or salesperson to check.
- Keep every version, so a revised quote shows what changed and why.
- Send a won quotation to your ERP, Tally or a spreadsheet as an order, without retyping the lines.
What it should not do is send anything technical on its own, guess a line it can't read, or hold the only copy of your prices. The price list stays yours and stays the single source; the tool reads from it. If a tool can't show you why it priced a line the way it did, an engineer can't sign it.
How should an enquiry pass between a principal and its distributors?
With its history, and with one owner. A valve maker may sell through stockists, agents and representatives in each market, and buyers don't always know which of them to write to. The handover between the factory and the distributor is where an RFQ is most likely to be lost: forwarded, assumed to be someone else's, and never answered.
A handover that works has four parts: a rule for who owns each market and product (stock items to the distributor, engineered valves to the factory, for example); the whole file passed with the enquiry, including the line-item list and anything already said to the buyer; a named owner who is responsible until it closes; and a report back, so the factory knows what happened to every enquiry it passed on.
Certificates follow the same path. EN 10204 includes a section on the transmission of inspection documents by an intermediary, Evidence · reported BS EN 10204:2004 Metallic products. Types of inspection documents. BSI Knowledge, 25 Oct 2004. Listed with the other sources at the end of this page. BSI Knowledge · checked 5 Nov 2026 Open the evidence → which is what a distributor does when it ships your valves with your certificates. If the distributor is quoting, it needs to know which certificate types you can supply before it promises them.
Where enquiries arrive from several places, AI automation can read each one, decide from your rules where it belongs and route it with its file, so the rule is applied every time rather than when someone remembers.
How do you follow up a valve quotation without chasing blindly?
By knowing what you are waiting for. A valve quotation is rarely accepted or refused at once: the buyer compares offers, sends technical questions, asks for revised deviations and waits for the project's own decisions. Follow-up that says only "any news?" adds nothing.
- Confirm receipt and the date the buyer expects to decide, when you send the quote.
- Answer technical questions from the same line-item list, so the answer and the quote never disagree.
- Remind before the quotation's validity ends, with what changes after it.
- Ask for the outcome when the decision date passes, and for the reason if you lost.
- Record the outcome and reason against every line, so next year's quotes start from what actually happened.
For leads met in person, at a valve exhibition or on a plant visit, the follow-up starts before any RFQ exists. Our sales app selXP captures the contact and what they asked about at the stand, and sends the follow-up with the right catalogue by email or WhatsApp.
Where does AI help, and where should a person decide?
AI is good at the reading: pulling line items out of a PDF, filling the fields of a list from a datasheet, spotting that a line names a standard edition you don't build to, and drafting a clarification question in the buyer's language. It is also good at the routine follow-up: noticing that a quote is about to expire, or that a buyer's reply has sat unread for two days.
A person decides everything that carries a commitment: whether a valve suits the service, what deviation to offer, the price, the delivery date and anything sent to a buyer that isn't a plain acknowledgement. Lines the AI can't read with confidence should be flagged, never guessed. Built that way, the engineer's day moves from copying to checking.
None of this helps if the RFQs don't arrive. Being found by buyers, and by the AI assistants they ask, is the other half: SEO and AEO (answer engine optimisation), not the customs status, covered in how buyers and AI assistants shortlist valve manufacturers and in what is AEO. Our free AEO check shows what four assistants say today when asked the kind of questions your buyers ask.
What can you measure once this is in place?
With every RFQ in one list and every decision recorded, a valve maker can see its own sales process, often for the first time. These are measures, not targets: what they should be depends on your products and your buyers.
| Measure | What it shows | Where it comes from |
|---|---|---|
| Time from RFQ to quotation | Where quotes wait, and for whom | The date each RFQ arrived and each quote was sent |
| Lines quoted against lines declined | How well RFQs fit what you make, and what you keep declining | The decision recorded on every line |
| RFQs answered | Whether every buyer hears back, which Aramco, for one, measures Evidence · reported Material Supplier Guide. Saudi Aramco, Jan 2020. Listed with the other sources at the end of this page. Saudi Aramco · checked 5 Nov 2026 Open the evidence → | The decision recorded on every RFQ |
| Quotes won and lost, by reason | Price, delivery, specification or silence | The outcome recorded on every quote |
| Enquiries handed over and closed | Whether the factory and each distributor follow up | The owner and outcome of every handover |
For how one RFQ would travel through a valve maker once this is built, see the case studies. For how to judge who builds it, read how to choose.
Questions
Do we need a CPQ system to quote valves?
Not necessarily. Large configure-price-quote systems suit makers with many configurable options and a team to maintain them. A valve maker may do better with a tool built around their own line-item list, price list and approval step, connected to the ERP they already run.
Can a quotation tool handle our buyers' different datasheet formats?
Yes, if it is built to read them into one list and to flag what it can't read. Standard forms map the same way every time; free-form datasheets need a person to confirm the fields the first few times.
Who should own an RFQ that arrives at the factory for a distributor's market?
Whoever your rule says, decided in advance and applied every time. One workable rule gives stock items to the distributor and engineered valves to the factory, but the rule matters less than having one and sticking to it.
Should our quotation say how long the price is valid?
Yes. A stated validity gives you a reason to follow up and protects you when material costs move. Remind the buyer before it ends.
Sources
- ISA software: ISA-TR20 and ISA-20 specification forms International Society of Automation
- IEC 60534-2-1:2011 Industrial-process control valves, Part 2-1: Flow capacity, sizing equations for fluid flow under installed conditions IEC Webstore
- API STD 598:2023 Valve Inspection and Testing BSI Knowledge · 1 Feb 2023
- BS ISO 5208:2015 Industrial valves. Pressure testing of metallic valves BSI Knowledge · 31 Jul 2015
- BS EN 10204:2004 Metallic products. Types of inspection documents BSI Knowledge · 25 Oct 2004
- Incoterms rules International Chamber of Commerce
- Material Supplier Guide Saudi Aramco · Jan 2020